Avenue Suites Georgetown

Washington, D.C.

Stirling Elmendorf Photography

01 / 09

Stirling Elmendorf Photography

02 / 09

Stirling Elmendorf Photography

03 / 09

Stirling Elmendorf Photography

04 / 09

Stirling Elmendorf Photography

05 / 09

Stirling Elmendorf Photography

06 / 09

Stirling Elmendorf Photography

07 / 09

Stirling Elmendorf Photography

08 / 09

Stirling Elmendorf Photography

09 / 09

Project Highlights

  • Scope of work evolved and grew in complexity, and planned communication techniques were adopted to ensure the needs of the owner were continuously met and guests were not impacted.

  • Rigorous design detail required special equipment/staff to be completed successfully—for example, an ornamental metal worker was utilized for some of the complex metal design.

  • Innovative value engineering techniques allowed for significant cost savings.

  • Project was delivered under budget.

Avenue Suites Georgetown

Overview

Project Scope

The renovation consisted of 13 guest suites and a 5,300-square-foot hotel lobby. Exterior work included reconstruction of the ADA access ramp, lighting work, removal of awnings, new signage, storefront packages (including the installation of a revolving door), and paint. Public space renovation work included an additional dining area, the addition of the A Bar, garden terrace, and floor-to-ceiling window framing system.

Avenue Suites Georgetown